Skip to Main Content
IBM Data and AI Ideas Portal for Customers


This portal is to open public enhancement requests against products and services offered by the IBM Data & AI organization. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:


Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,


Post your ideas

Post ideas and requests to enhance a product or service. Take a look at ideas others have posted and upvote them if they matter to you,

  1. Post an idea

  2. Upvote ideas that matter most to you

  3. Get feedback from the IBM team to refine your idea


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

IBM Employees should enter Ideas at https://ideas.ibm.com


ADD A NEW IDEA

All ideas

Showing 15251 of 15251

Restrict report output format

We would like the option to restrict the output versions of a report on a report by report basis (not system-wide by user class).
over 8 years ago in Cognos Analytics 1 Functionality already exists

Stop agent from continuously checking once condition is met in Event Studio.

Customer would like agent to stop running once condition has been met for that day.
almost 10 years ago in Cognos Analytics 0 Not under consideration

Add Columns as Suppression Options for Lists

Crosstabs provide 4 Suppression Options based on Rows and Columns whereas Lists allow only for Row-based suppression. While Column-based suppression can be achieved in a List by using render variables, this is very time consuming when multiple Col...
over 8 years ago in Cognos Analytics 0 Not under consideration

Ability to pre-filter data before dq rule execution

Currently we have a workaround using DataStage flows which is very complicated for end users to do themselves. We here in 2H 2023 there will be something using virtual tables?
over 1 year ago in Knowledge Catalog 1 Functionality already exists

3rd party software, The Control Machine, runs right before Distribution to assign accumulators. FTM assigns accumulators at ingestion based on DOW/TOD but if UOWs take too long to get thru the system, PNC wants to call Bus Rules to reassign which could include pocket, endpoint, and accumulator

FTM assigns accumulators at ingestion based on DOW/TOD but if UOWs take too long to get thru the system, PNC wants to call Bus Rules to reassign which could include pocket, endpoint, and accumulator
over 1 year ago in Financial Transaction Manager  / Check 0 Not under consideration

Error to be displayed when saving a rule with feeders but not skipcheck

We recently experienced the following issue: A manual action made the skipcheck code disappear at the top of our code. We saved the rule without receiving any error and then closed it. This change resulted in big performance issues of our service ...
over 1 year ago in Planning Analytics 1 Not under consideration

Support for RFC4180 CSV standard format

I want the Sequential file stage of DataStage to support the standard CSV format of RFC4180.
almost 3 years ago in DataStage 0 Not under consideration

Add a link ordering option to DataStage Sequence Activities

In several DataStage stages there is a link ordering option (e.g. Transformer or Join Stage), this is not the case for DataStage Sequence Activities. If a sequence has multiple output links, then the order of these can only be changed by deattachi...
over 5 years ago in DataStage 0 Not under consideration

Decreasing CF memory is slow

While working with PureScale, there may be a need to create room for new DB in the system. Once this happens we need to reconfigure CF memory, while keeping system up and running. We are concerned regarding CF_MEM_SZ , CF_GBP_SZ and CF_DB_MEM_SZ, ...
almost 3 years ago in Db2 / pureScale 0 Future consideration

Ability to copy to left pane in subset editor to be able to use advanced filtering

Ability to copy to left pane in subset editor to be able to use advanced filtering
about 4 years ago in Planning Analytics 1 Not under consideration