Skip to Main Content
IBM Data and AI Ideas Portal for Customers


This portal is to open public enhancement requests against products and services offered by the IBM Data & AI organization. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:


Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,


Post your ideas

Post ideas and requests to enhance a product or service. Take a look at ideas others have posted and upvote them if they matter to you,

  1. Post an idea

  2. Upvote ideas that matter most to you

  3. Get feedback from the IBM team to refine your idea


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

IBM Employees should enter Ideas at https://ideas.ibm.com


ADD A NEW IDEA

All ideas

Showing 15268

Task Focused UI - Reporting Period Dropdown in Top Bar

In the current Task Focused UI, the user needs 5 clicks to change the reporting period: - User (opens sidebar)- Change reporting period (opens the popup)- Open the dropdown menu- Click on the desired reporting period- Hit save Which then refreshes...
over 1 year ago in OpenPages Ideas / End User UI 5 Future consideration

A tool to copy/synchronize database schemas between environments.

A tool to copy/synchronize database schemas between environments. Dbschema does not help if a test environment needs a schema refresh. A tool is needed to unload the schema and then apply the schema into another environment generating with not jus...
over 1 year ago in Informix / Informix Server 0 Not under consideration

Auto assign Data Classification

we will like to explore option to automatically assign data classification to the assets based on predefined condition. This is required as when we run the job to publish catalog, the software does not tell us which is the new tables being publish...
over 1 year ago in Knowledge Catalog 1 Planned for future release

Data Modules - For data server connections and uploaded files, turn off/on cleansing of table and column labels

This is how it works today: For data server connections and uploaded files, the table and column labels are cleaned up in English and some other languages in the following way: For single files, the file extension, such as .xls or .csv, is remove...
over 5 years ago in Cognos Analytics 1 Not under consideration

Make DB2_USE_ALTERNATE_PAGE_CLEANING=ON the default

DB2_USE_ALTERNATE_PAGE_CLEANING is of great benefit for performance and scalability since it was introduced in v8. It's now the default in pureScale and BLU environments, so why can't we make it the default all around?
almost 6 years ago in Db2 / Configuration Parameters 0 Not under consideration

Customization of Drill-through cube view in Planning Analytics Workspace

Currently when you create drill-through process and use it in PAW books opened drill-through cube view isnt customizable and its using the default classic cube viewer (not the new one). Is it possible to add new enhanced features to enable the Mod...
about 2 years ago in Planning Analytics 1 Not under consideration

HADR Standby logarchiving

Hi, HADR standby databases do not archive log files. the recommendation is a shared filesystem or similar. Shared filesystems adds complexity in failure situations. This request is to enable the functionalty of logarchiving on the standby database.
over 7 years ago in Db2 / High Availability and/or Disaster Recovery 0 Future consideration

Need ability to get an entry in audit db when report is failed to send an emails

Hi, we have logging enabled to both file and database configured. we deployed the Audit database and successfully logging to that database. If a report is to be emailed to a user and that email fails, we do not get that entry in the Audit database...
almost 7 years ago in Cognos Analytics 0 Not under consideration

UPDATE STATISTICS MEDIUM/HIGH with PDQ should favour use of indices for sort when more than one column is specified

Currently (in my testing) any UPDATE STATISTICS MEDIUM/HIGH statement with PDQ specifying more than one column will not use indices for sort and will instead scan the table, write to temporary files and sort. This is true even when all columns spe...
over 1 year ago in Informix / Informix Server 0 Not under consideration

Sort data calculations should not be used to determine number of passes for UPDATE STATISTICS MEDIUM/HIGH statements where an index is used, fix misleading explain output

UPDATE STATISTICS MEDIUM/HIGH can be used with an explain option. The explain file always shows a sort data calculation which then determines the number of table scans (passes) the database engine will undertake. These are calculated before any de...
over 1 year ago in Informix / Informix Server 0 Not under consideration